Page 10 - druvaPUR Katalog-DE
P. 10
GCE CENTRAL GAS SYSTEMS
TEST REPORT / No. 2018-157_TR1a
No part of this test report must be used separately
The test results are related to the tested samples only
VTLA000
VTLA000001
VTLA000
3
Kategorie / Category:
o-
pment
13.07.2018 (2018-07-13) 8B55408
10297:2015
Type tests
Annex C Oxygen pressure surge test
-line:
20.07.2018 (2018-07-20) 02.08.2018 (2018-08-02)
The specification was inserted in the wording received
TESTING LABORATORY BY GCE, s.r.o.
Page No.: 1
CZ-583-01 Total No. of pages: 20
Czech republic
For_SOP_LAB_11_2/2
10 | Central Gas Systems ⁄ Druva PUR