Page 10 - druvaPUR Katalog-DE
P. 10

GCE CENTRAL GAS SYSTEMS





                                                                      TEST REPORT / No. 2018-157_TR1a
                                                                      No part of this test report must be used separately
                                                                    The test results are related to the tested samples only



                   VTLA000





                   VTLA000001


                   VTLA000



                   3

                   Kategorie / Category:



                                                  o-
                   pment


                   13.07.2018 (2018-07-13)                    8B55408



                               10297:2015


                   Type tests






                   Annex C   Oxygen pressure surge test









                                                                                       -line:
                                             20.07.2018 (2018-07-20)       02.08.2018 (2018-08-02)


                                                                    The specification was inserted in the wording received








              TESTING LABORATORY BY GCE, s.r.o.
                                                                                                    Page No.: 1
              CZ-583-01                                                                       Total No. of pages: 20
              Czech republic
                                                                                               For_SOP_LAB_11_2/2


          10 | Central Gas Systems  ⁄  Druva PUR
   5   6   7   8   9   10   11   12   13   14   15