Page 11 - druvaPUR Katalog-DE
P. 11

GCE CENTRAL GAS SYSTEMSE CENTRAL GAS SYSTEMS
                                                                                         GC




                                                                     TEST REPORT / No. 2018-58_TR1
                                                                   No part of this test report must be used separately
                                                                 The test results are related to the tested samples only



                       / Product:
                  VTLFRSGXN14FN14FN14FN14F


                  Kategorie / Category:
                          / Industry




                         / No. of samples:
                  3ks

                          / Product No.:
                  VTLF000001
                          / Drawing No.:
                  VTLF000

                           / The date of assignment:
                  28. 12. 2016 (2016-12-28)
                           / Project No.:                                                / No. of the test requirement:
                  8B55408                                               2018-58


                                 / Standard (or name of the test):
                                           / annex C


                  Typ vzorku / Sample type:
                                 / Not-applicable
                                                              / Other information (threads, inlet/outlet pressure, test description
                  1x inlet thread NPT1/4"female
                  3x outlet thread NPT1/4"female
                  working pressure max.300 bar

                  The valve is classified as a main shut-off valve

                           / Reason for testing:
                  Type test







                        / Customer:
                                department 21



                         / Examiner:                         / Samples delivery date:     / Dead-line:
                                                11. 5. 2018 (2018-05-11)        10. 9. 2018 (2018-09-10)

                              The specification was translated to English and modified acc. to appendix No. 2 to test requirement No. 2018-58


              TESTING LABORATORY BY GCE
                                                                                                    Page No.: 1
              CZ-583-01                                                                       Total No. of pages: 23
              Czech republic
                                                                                               For_SOP_LAB_11_2/3


                                                                                        Druva PUR  ⁄  Central Gas Systems  | 11
   6   7   8   9   10   11   12   13   14   15   16